V1/30HF high-strength grout (C100/115)

highly flowable swelling grouting mortar with very high initial and final firmness in accordance with the DAfStb VeBMR directive

  • high-strength grouting mortarl
  • concrete restoration in accordance with DIN EN 1504-6
  • high frost and de-icing salt resistance
  • pumpable
  • controlled swelling for adherent bonding between concrete and machine parts
  • high resistance to fatigue, stabilises vibrations
  • cement-bound
  • granularity: 0-3 mm
  • grouting height: 30-300 mm
  • consumption: 2.300 kg/m³
  • processing time at 20°C (68 °F): about 60 min
  • expansion after 24 h: ≥ 0,1 %
  • compressive strength after 24 h: ≥ 70 N/mm²
  • compressive strength after 28 d: ≥ 120 N/mm²
CE marking QDB certificate of conformity DAfStb/VeBMR
V1/30HF

Request test certificates

If you need further test certificates, please do not hesitate to contact us.
Tel. +49 201 685040
Email: pruefzeugnisse@pagel.de

Please enter your name.
Please enter a subject.
Please enter a valid phone number.
Please enter a message.

I have read the data protection declaration and I consent to the data I have provided being electronically collected and stored. My data is used only strictly for the processing and answering of my request.

You must accept the Terms and Conditions.

properties

  • high strength after 24 hours
  • high fatigue resistance
  • sedimentation stability
  • pumpable over long distances
  • long processing time
  • microsilica additives
  • controlled swelling
  • high resistance to frost and de-icing salt (CDF proof)
  • construction material type A1, according to the ruling 2000/605/EG of the European Commission, September 26th 2000 (published in official journal, L258)

classification according to VeBMR

  • flowability class: f1
  • shrinkage class: SKVM 0
  • early strength class: A
  • compressive strength class: C100/115

fields of application

  • Onshore grouting: hybrid-tower, steel tower, reinforced steel tower, pre-stressed concrete tower
  • Offshore grouting: monopile, jackets, transformer platform
  • portal and container railway installations